Results
Since its foundation, the management of «Engineering Company «Atom Energy Project» LLC was set the tasks: personnel training and obtaining a number of permits for acquire the rights for rendering services for energy facilities.
As of today, all assigned tasks have been successfully completed, as follows:
draft and put into force the «Regulations on the procedure for testing the knowledge of the rules, norms and standards on radiation and nuclear safety in nuclear energy for management, members of the standing commission and experts «Engineering Company «AEP» LLC. The specified the «Regulation ...» agreed by SNRIU (Ref. № 15-19/7061 from 08.11.2012) and NNEGC «Energoatom» (ref. number 15789/06 of 02.11.2012).
To carry out work and rendering services for nuclear power plants in Ukraine, the company «EC «AEP» LLC passed the audit and documentation expertise for obtaining a permit for performance hazardous works (Resolution № 392.13.32 from 06.02.2013).
For high-quality services on the Ukrainian NPPs, the company's staff has been trained and tested knowledge in the following directions: labor protection, safety regulations and maintenance of electric installations, design and safety operation of the pressure vessels, the quality management system ISO - which is confirmed by the available protocols.
In 2012, our partner - «CKTI-VIBROSEISM» Ltd. (Russia), carried out a course of engineering staff «EC «AEP» LLC: «Seismic qualification of nuclear power plant structures, systems and components of the equipment, using a database».
In accordance with the Law of Ukraine «On the use of nuclear energy and radiation safety» and the Resolution of the Cabinet of Ministers of Ukraine No. 1471 from 25.12.1997, the key engineering staff of «EC« AEP» LLC has security clearance of the first category, and the CEO, executive Director and Chief accountant - the third category.
On «IC «AEP» LLC has developed and put in force the quality management system. Its successful functioning confirms the positive conclusion of field audit of the quality system of the representatives of NNEGC «Energoatom» and its SS NPP.
«EC «AEP» LLC approved vendor of works, goods and services to the NNEGC «Energoatom» and its separate divisions (Decision number No.РШ-П 0.21.057-18 dated 17.07.2018).